The short answer
For most segmental (block) retaining walls, the base is a layer of compacted, angular crushed stone. Names vary by region, such as dense-grade aggregate, crushed stone with fines, road base, or “3/4 minus.” The key traits are angular pieces mixed with some fines, so that the material packs together tightly when compacted. Always follow the wall block manufacturer’s installation instructions and local requirements, since they govern your wall.
Why the base matters
The base supports the entire wall and keeps the first course level. If it settles or shifts, the courses above can tilt, gap, or bulge. A good base also stays stable when wet, which matters because water is a major cause of retaining wall problems. A level, well-compacted base makes every course easier to set.
Materials that work, and ones to avoid
Generally good choices
- Compacted crushed stone with fines (dense-grade aggregate or similar). Angular pieces lock together and compact into a firm, stable layer.
- Crushed stone of a size recommended by your block manufacturer. Some manufacturers specify a particular gradation.
- In some designs, a lean concrete footing. Occasionally specified for taller or engineered walls or poor soils. It is a design decision.
Generally poor choices
- Pea gravel and other rounded stone. Rounded pieces roll and do not lock together, so they tend to shift under load.
- Sand alone. It can wash out and compact unevenly, though some manufacturers allow a thin leveling layer of sand on top of the compacted base. Check the instructions.
- Polymeric sand. It is made for filling paver joints, not for supporting a wall.
- Topsoil, clay, or organic fill. These hold water, settle, and compress.
- Recycled materials with unknown content. They can vary in quality and contain debris.
How deep and how wide should the base be?
Manufacturers and installation guides commonly call for a base several inches thick for smaller walls, extending in front of and behind the first course. Taller walls, weak soil, and areas with frost generally need more. Because the exact numbers depend on the product, wall height, soil, and climate, use your manufacturer’s guide or an engineer’s design rather than a general rule of thumb. Excavate down to firm, undisturbed soil and remove topsoil and organic material before building the base. Where the soil is soft, you may need additional excavation and base depth.
Compaction
Compaction is as important as the material.
- Place the stone in thin layers called lifts, rather than all at once, and compact each lift.
- Use a plate compactor for best results; hand tamping is generally not enough for anything but small jobs.
- Lightly moist material often compacts better than very dry or soaked material.
- Check level in both directions as you go, since correcting an uneven base after the first course is difficult.
Plate compactors are heavy and loud. Wear hearing protection, eye protection, and sturdy boots, and keep your feet clear of the plate.
What goes behind the wall
Water pressure behind a retaining wall is a common cause of failure, so the base is only part of the system. Typical designs include:
- Clean, angular drainage stone behind the wall. This is usually a free-draining stone, such as clean crushed stone with no fines, placed in a column behind the blocks. Your manufacturer will specify the width.
- A perforated drain pipe at the bottom of the backfill, sloped to an outlet, to carry water away.
- Filter fabric between the drainage stone and the native soil to keep soil from clogging the stone.
- A cap layer of less permeable soil at the top to limit surface water entering.
This is the same principle that applies to house foundations: water that cannot drain builds pressure. For that topic, see water leaking through a foundation or basement.
What is the 1/3 rule?
You may see references to a “1/3 rule” for retaining walls. Sources use it in different ways, and it is not a universal standard, so do not rely on it without checking. Some guidance describes burying a portion of the wall height below grade to help anchor the wall, and manufacturers usually give a specific embedment based on block type and wall height. Follow the instructions for your block system rather than a single ratio.
Steps for building the base
- Plan and call before you dig. In many places you can call a free utility locating service before excavating. Do this to avoid hitting gas, electric, water, or communications lines. Striking a buried line can be dangerous.
- Check permits and height limits. Many areas require permits or engineering for walls above a certain height, or walls that support a driveway, building, slope, or water. Ask your local building department.
- Mark the wall line and excavate to the depth recommended, removing soft or organic soil.
- Compact the native soil at the bottom of the trench.
- Add base stone in lifts, compacting each.
- Screed the surface level, and check with a level and string line.
- Set the first course carefully, since every course above depends on it.
- Install drainage stone, pipe, and fabric as you build.
When to get an engineer or permit
Get an engineer’s design for taller walls, walls on a slope, walls supporting loads such as driveways, buildings, or pools, walls near foundations, and poor soils. Collapsing retaining walls can injure people and damage property. If an existing wall is already cracking or leaning, see cracks in a retaining wall. If you are unsure, a short consultation is cheap insurance. If you need to understand reinforcement in a concrete wall, which has different design considerations from a segmental wall, see foundation wall rebar spacing.